Stormwater Best Management Practices Demonstration Repair of Storm Related Damage Holistic Site Management Groundwater and Soil Investigation Beneficial Use of Landfill Gas Landfill Gas to Energy Solid Waste Planning Enhanced IN-SITU Bioremediation AS/SVE With IN-SITU Oxidation Landfill Maintenance Remediation Systems Operation and Maintenance Environmental Compliance

STORMWATER BEST MANAGEMENT PRACTICES (BMP) DEMONSTRATION - Riverlink, Inc. | Buncombe County, NC

details


before


after
RiverLink, Swannanoa Stormwater Best Management Practices (BMPs): Altamont and Landmark Landscapes, Inc. designed and implemented four separate BMP demonstration projects in the Swannanoa Watershed for the local non-profit environmental group, RiverLink. The four projects involve of a variety of site conditions, multiple stakeholder, and stormwater management features including raingardens, a stormwater wetland, bioswales, and enhancement of streambank vegetation. Demonstration sites were chosen due to the diversity of sizes, locations, and stakeholders to demonstrate the use of urban BMPs to abate stormwater runoff in order improve water quality in the Swannanoa River. The demonstration sites have provided both the intended stormwater abatement, as well as educational opportunities and aesthetically pleasing landscaping for the properties.

challenges

The project had a strict schedule and included site design; obtaining 401/404 permits, city grading (sediment and erosion control) permits, conservation easements; meeting with multiple stakeholders, and effective project management.

To learn more, contact us now or request more information.





© 2006 All Rights Reserved :: Altamont Environmental, Inc :: 50 College Street :: Asheville, NC 28801
tel. 828.281.3350 | fax. 828.281.3351 | email. mail@altamontenvironmental.com